Dryer equipment installation and construction

In accordance with the equipment process layout drawing and installation construction drawing, foundation drawing, equipment outline size and mutual spacing drawn by the process technology department, draw lines and locate, organize the foundation construction and equipment handling in place. When designing the equipment process floor plan, the following factors should be considered for equipment positioning.

(1) Should be adapted to the needs of the technological process

(2) It should be convenient for the storage, transportation and on-site cleaning of workpieces

(3) The outer dimensions of the equipment and its accessories, the extreme positions of moving parts and the safety distance

(4) Requirements for the safety of equipment installation, maintenance and operation shall be guaranteed

(5) Work matching between plant and equipment, including the width and height of the door, the span and height of the plant, etc.


The equipment should be installed and leveled in accordance with the relevant specifications for the acceptance of mechanical equipment installation to ensure stable installation, reduce vibration, avoid deformation, ensure processing accuracy, and prevent unreasonable wear. Technical clarifications should be made before installation, and construction personnel should be organized to study the relevant technical data of the equipment carefully, and understand the performance and safety requirements of the equipment and the issues during construction.


During the installation process, the construction of foundation production, assembly links, electrical wiring and other items must be strictly implemented in accordance with the construction specifications. If there are special requirements for constant temperature, shockproof, dustproof, moistureproof, fireproof and other special requirements in the installation process, measures should be taken, and the construction of the project can be carried out after the conditions are met.